The Solution

Territory-clustered beats, sequenced to cut backtracking

One SO territory, one six-day cycle. Toggle to compare the inherited beat with the data-built one. Hover an outlet for detail; hover a day to isolate its route.

1 SO · 64 outlets · Mon–Sat cycle · Illustrative layout
Avg travel per beat day
–
Outlets on a beat
–
Volume potential covered
–
How the after-beat is built
  1. Outlets grouped into six contiguous sectors around the SO's base.
  2. Each day sequenced nearest-first, then untangled to remove crossings.
  3. Every outlet lands on a day; large dealers anchor each route.

Figures indicative; illustrative territory layout.